BSRIA has launched a free-to-download topic guide entitled ‘Offsite Construction for Building Services’. The ‘at a glance publication’ aims to give readers a glimpse of the subject and suggests further reading.
Offsite construction, sometimes also referred to as ‘offsite manufacture’, ‘pre-fabrication’ or ‘modular construction’, is a general term for making parts of a building away from the construction site, in a purpose-built facility, before transporting them and installing them in their final location. It has the potential to make things on site much easier.
Mechanical and electrical systems
Installing several mechanical and electrical systems on a ‘live’ construction site can be challenging, with limited space, health and safety considerations. And often to a demanding schedule.
The guide highlights offsite construction for services distribution, namely: vertical services risers; larger assemblies; horizontal distribution; offsite construction for packaged rooms – and inside or outside? Also included is whether offsite construction is right for the project in hand.
[edit] Author comments
The guide’s author, John Sands, Principal Consultant, BSRIA, said:
“As with any technology or process, the use of offsite construction needs to be considered carefully to get the best from it. Working in a controlled, purpose-made environment can increase productivity, with no distractions from other construction site activities or issues.
“Time spent on site is also reduced as assemblies arrive ready to be put in place, together with reduced downtime in the factory where work isn’t affected by other events on the construction site.
“The controlled environment enables quality to be improved – the right conditions can be provided for the task and quality control procedures followed – rather than the general conditions of the construction site.
“But it is worth remembering, that flexibility can be reduced as it is harder to accommodate changes that occur on site if the assemblies are being made in the factory – especially at short notice.”
[edit] A few watchpoints
- Consider early on if offsite construction techniques are to be used on the project.
- When considering offsite construction, make sure that the designers know – it may affect the design solutions that are put forward.
- There are different scales of offsite construction, from widespread services distribution to local applications such as packaged plant rooms, see what suits the project.
TG 17/2019 'Offsite Construction for Building Services' is free to download from the BSRIA website: BSRIA topic guides.
--BSRIA
[edit] Related articles on Designing Buildings Wiki
- Design for deconstruction.
- Design for Manufacture and Assembly (DfMA).
- Drainage.
- Fabricated drainage stacks.
- Flying factory.
- Housing Defects Act 1984.
- Kit house.
- Modern methods of construction.
- Modular buildings.
- Off site materials.
- Off site, on track.
- Off-site construction.
- Offsite manufacturing.
- Off-site prefabrication of buildings: A guide to connection choices.
- On site storage solutions.
- On-site Productivity Issues
- Plug and play skyscrapers.
- Prefabricated structural panels.
- Prefabrication.
- Secondary Ventilation Stacks in Tall Buildings.
Featured articles and news
Boiler Upgrade Scheme and certifications consultation
Summary of government consultation which closes 11 June 2025.
Deputy editor of AT, Tim Fraser, discusses the newly formed society with its current chair, Chris Halligan MCIAT.
Barratt Lo-E passivhaus standard homes planned enmasse
With an initial 728 Lo-E homes across two sites and many more planned for the future.
Government urged to uphold Warm Homes commitment
ECA and industry bodies write to Government concerning its 13.2 billion Warm Homes manifesto commitment.
Places of Worship in Britain and Ireland, 1929-1990. Book review.
The emancipation of women in art.
CIOB Construction Manager of the Year 2025
Just one of the winners at the CIOB Awards 2025.
Call for independent National Grenfell oversight mechanism
MHCLG share findings of Building Safety Inquiry in letter to Secretary of State and Minister for Building Safety.
The Architectural Technology Awards
AT Awards now open for this the sixth decade of CIAT.
50th Golden anniversary ECA Edmundson awards
Deadline for submissions Friday 30 May 2025.
The benefits of precast, off-site foundation systems
Top ten benefits of this notable innovation.
Encouraging individuals to take action saving water at home, work, and in their communities.
Takes a community to support mental health and wellbeing
The why of becoming a Mental Health Instructor explained.
Mental health awareness week 13-18 May
The theme is communities, they can provide a sense of belonging, safety, support in hard times, and a sense purpose.
Mental health support on the rise but workers still struggling
CIOB Understanding Mental Health in the Built Environment 2025 shows.
Design and construction material libraries
Material, sample, product or detail libraries a key component of any architectural design practice.
Construction Products Reform Green Paper and Consultation
Still time to respond as consultation closes on 21 May 2025.
Resilient façade systems for smog reduction in Shanghai
A technical approach using computer simulation and analysis of solar radiation, wind patterns, and ventilation.
Comments